What we charge, and what the government charges

Pricing

For medical devices and for medicines, in six markets. Published because the alternative — "contact us for a quote" — is how this industry keeps buyers from comparing. Every figure below is either our fee, which is fixed, or a regulator's published fee, which we pass through at cost with the receipt.

Three rules

How we price

Fixed, not hourly

You are quoted a number before the work starts and that number is what you pay. If we misjudge the effort, that is our problem — which is the correct incentive for the person doing the scoping.

Official fees at cost

Regulator fees, representative licences and legalisation are billed exactly as paid, with the receipt attached. We do not mark them up, and we do not bundle them into a round number that hides the margin.

Never a share of revenue

No percentage of your sales, no success fee, no commission from a distributor for introducing you. Our income does not change with who you appoint or how much you sell.

Why the third rule matters more than it sounds. A success fee sounds fair until you notice what it rewards: submitting the file before it is ready, because the fee only lands on approval. In regulatory work the person preparing the dossier must be paid the same whether or not the answer is "wait." That is why we take a fixed fee and no upside.

Our fees

Three stages

Route assessment

£1,450

One product family, up to two markets. Written route, gap list, cost model and a verdict. Credited in full against the project if you proceed.

2 weeks · fixed · +£600 per extra market

Registration project

£12,000–25,000

Per product family, per market, device or medicine. Representative appointment, dossier assembly, submission and every regulator question through to authorisation.

Billed at milestones

Maintenance

£2,000–6,000

Per market, per year. Renewals, variations, added products, import permits, reporting deadlines and a quarterly regulatory change note.

Annual · 12-month term

Additional products added to an existing registration are quoted individually and are always a fraction of the first — the licences, the representative and the relationship already exist.

Put your own numbers into it

The cost estimate assembles the lines below — the regulator's published fees for your class, our fixed band for your market, and the third-party costs marked as estimates — into one sheet you can print or send. It will not guess at a budget for a market whose fee schedule we have not yet verified, and it says so on the page.

Not our money

What the regulators charge

These are published by the authorities and paid to them. We show them because a quote that does not separate them is hiding something.

Saudi Arabia — SFDAFee
Marketing authorisation, Class ASAR 15,000
Marketing authorisation, Class BSAR 19,000
Marketing authorisation, Class CSAR 21,000
Marketing authorisation, Class DSAR 23,000
RenewalSAR 5,000
Label, IFU or advertising updateSAR 1,100
Authorised representative licenceSAR 2,600 / year
United Arab Emirates — EDEFee
Device marketing authorisationAED 100 + 5,000
RenewalAED 100 + 2,500
Product classification determinationAED 500
Manufacturing site registration, renewalAED 100 + 10,000
Medical warehouse licenceAED 7,500 + inspections
Import permitAED 100 + 1% of CIF

Checked against the regulators' published schedules in August 2026. Saudi figures come from a dated fee sheet; the Emirati pages carry no publication date, so we re-confirm them with the authority before they enter a quote. Currency is converted at the rate on the date of payment, and we invoice you the actual amount paid.

For medicines

A different set of authorities, a different shape of cost. The registration fee stops being the big number.

United Arab Emirates — EDEFee
Marketing authorisation, conventional or biological medicineAED 7,000
Marketing authorisation, general sales list or natural sourceAED 5,000
Renewal, conventional or biologicalAED 3,500
VariationAED 1,000
Laboratory analysisAED 3,000
Pharmacovigilance plan evaluationAED 1,000
Pricing certificate, single productAED 500
Manufacturing site registration or renewalAED 10,000
Good manufacturing practice certificateAED 2,000 per line, per year
Nigeria — NAFDACFee
Registration, prescription medicineUS$1,200–1,280
Registration, over-the-counter medicineUS$967
Renewal80% of the registration fee
Foreign GMP inspection, per siteUS$10,989
Desk review where the site has already been inspectedUS$5,000
Türkiye — TİTCKFee
Application, new molecule or reference product₺816,512
Application, generic₺489,908
Renewal₺24,360
Variation, type IA · IB · II₺5,174 · 12,318 · 24,360
Foreign GMP inspection, first time, one site and one product≈ ₺1,785,375

For a medicine the inspection is the fee that matters.

In Nigeria a foreign site inspection costs roughly nine times the registration fee it accompanies. In Türkiye it costs roughly twice a new-molecule application. Neither number appears in a quote that lists only "registration fees", and neither is avoidable on first entry — the relief is either a reliance route that accepts your existing GMP certificate, or a second product filed behind the same inspection. Which of those is open to you is a question with a documented answer, and it belongs in the assessment rather than in a surprise invoice.

Emirati figures from EDE's published service catalogue; Nigerian from the NAFDAC tariff effective 31 January 2020, which is still the only one NAFDAC publishes; Turkish from the TİTCK tariff of 23 March 2026, which is reissued during the year. Egypt publishes no medicine fee schedule at all — amounts appear only as figures embedded in guideline prose. South Africa publishes its fee regulation as a scanned image with no readable text layer, so we hold the gazette citation and not the numbers. Where we cannot cite a figure we leave the line empty rather than borrow one, and we confirm it with the authority during the assessment.

Third-party costs that are neither ours nor the regulator's: translation into Arabic, notarisation and embassy legalisation, sample shipping, and testing where a market requires it. We estimate these in the assessment and pass them through at cost. Legalisation in particular has its own queue and is the most common cause of a delayed Emirati file.

Worked through

What a first market actually costs

Three worked examples: two devices and one medicine. Our fees in sterling, official fees in local currency, third-party costs marked as estimates.

A device — Class B, CE marked, one product family

Saudi Arabia, year oneAmount
Route assessment£1,450 credited
Registration project, our fee£12,000–16,000
SFDA marketing authorisation, Class BSAR 19,000
Representative licence, first yearSAR 2,600
Translation, notarisation, legalisation estimate£1,500–4,000
Our fee, net of the credited assessment£12,000–16,000
Paid to SFDASAR 21,600
United Arab Emirates, year oneAmount
Route assessment, second market on the same file£600 credited
Registration project, our fee£12,000–18,000
EDE device marketing authorisationAED 5,100
Manufacturing site registrationAED 10,100
Classification determination, if requiredAED 500
Embassy legalisation of free sale certificate estimate£800–2,500
Our fee, net of the credited assessment£12,000–18,000
Paid to EDEAED 15,700

The Emirati project sits higher in the range than the Saudi one for a reason that has nothing to do with paperwork volume: statute requires at least two licensed importers, so the structure has to be designed and contracted rather than simply appointed. Warehouse licensing is normally borne by the licensed establishment itself; where it is recharged, it appears on your invoice at cost.

A medicine — conventional, one strength, MHRA-authorised

United Arab Emirates, year oneAmount
Route assessment£1,450 credited
Registration project, our fee£14,000–20,000
EDE marketing authorisation, conventional medicineAED 7,000
Manufacturing site registrationAED 10,000
Good manufacturing practice certificate, one lineAED 2,000
Laboratory analysisAED 3,000
Pharmacovigilance plan evaluationAED 1,000
Pricing certificateAED 500
Certificate of pharmaceutical product, legalisation and sworn translation estimate£1,200–3,500
Our fee, net of the credited assessment£14,000–20,000
Paid to EDEAED 23,500

The medicine sits above the device on the same regulator for three reasons, all of them work rather than markup: module 1 of the dossier has to be rebuilt to the Emirati regional specification, the certificate of pharmaceutical product has to be obtained and legalised in the country of manufacture, and the pricing submission is a separate exercise from the authorisation. The two-importer requirement applies to both. Note what is not in this table: Emirati medicine pricing is set against a reference-country list that exists in statute and is published nowhere, so a price cannot be modelled from public sources — that is stated plainly on the market page rather than papered over with an estimate.

The range

What moves a project to the top or the bottom of it

  1. Risk class, or product type

    For a device, higher classes carry more evidence and, in some markets, additional safety and efficacy requirements. For a medicine the equivalent split is generic against new molecule against biological, and it moves the regulator's own fee as much as ours.

  2. State of your file

    A current CE or FDA file that only needs reformatting sits at the bottom of the range. A file assembled years ago by a consultant who has since disappeared sits at the top.

  3. Number of variants

    One device is a project. Fourteen SKUs across three configurations is a different project, and it is cheaper per SKU but not per project.

  4. Structure complexity

    Where statute requires multiple importers, or where you already have a distributor whose contract must be unpicked, the commercial design takes real time.

  5. Translation volume

    A device with a 60-page instruction manual for lay users costs materially more than a professional-use device with a two-page insert.

  6. Whether the inspection can be avoided

    Medicines only. Where a reliance route accepts your existing GMP certificate, a five-figure foreign inspection disappears from the budget. Where it does not, it is usually the largest line in it.

  7. Whether the assessment report can be shared

    Medicines only, and it is a legal decision rather than a regulatory one. Releasing the unredacted assessment report from your home authority moves you onto lighter review in more than one of these markets.

  8. Whether you are ready

    The cheapest projects are the ones where the assessment found few gaps. That is the actual argument for doing the assessment first.

Terms

Payment, and what we will not do

Assessment invoiced before the kickoff call. Projects billed at agreed milestones, never wholly in advance. Maintenance annually, and it does not auto-renew — we ask you each year, which occasionally produces the answer "no" and that is fine.

We are not currently registered for VAT, so no VAT is charged on our fees. That will change when we cross the threshold, and existing clients will be told before it appears on an invoice.

Things we decline

  • Success fees or any payment contingent on approval
  • Any percentage of your revenue in the market
  • Commission or referral payments from distributors, representatives or testing houses
  • Marking up official fees, or quoting them as an inclusive round number
  • Discounts in exchange for exclusivity or a multi-year lock-in
  • Working without a signed scope, because that is where disputes are born
Marginal cost

What the next one costs

The first market is expensive and every one after it is cheaper — but not for the reason people expect. The saving is not a volume discount. It is that the licences, the structure, the representative relationship and the rebuilt file already exist.

What you are addingPaid againNot paid again
Second market, same productFull project fee for that market, plus that regulator's own feesThe assessment for it, if bought together at £600 rather than £1,450; and the technical file work, which is done once
Second product, same market, same classA reduced project fee and the regulator's product feeRepresentative licensing, structure design, and the market groundwork
Variants and SKUs on an existing authorisationQuoted individually, normally a fraction of the firstAlmost everything else
Renewal when the term expiresThe regulator's renewal fee, which is a fraction of the originalThe whole registration — provided nobody let it lapse

This is why the sequencing conversation in the assessment matters more than the fee negotiation. Choosing the right first market decides what everything after it costs.

The other number

What it costs to get it wrong

Nobody publishes this one, and it is usually larger than the fee being negotiated.

  • Official fees are paid at submission and are generally not returned when an application fails or is withdrawn. A resubmission means paying the regulator again — so a file submitted early to save a month can cost the whole fee twice.
  • A refused application costs the year, not just the money. Where your route runs through public tenders, the cycles are annual: an authorisation that lands two months after the submission window has cost you a year of revenue, whatever it cost in fees.
  • A registration in the wrong name is the expensive one. In markets where the authorisation cannot be transferred, discovering that it sits in your distributor's name is not a paperwork problem. It is the price of the entire registration again, paid from a weaker negotiating position than the one you started in.
  • For a medicine there is a fourth, and it is not a fee at all. A launch price set once and then frozen. South Africa's single exit price is unregulated when you declare it and moved afterwards only by the Minister's annual percentage — 1.47 per cent for 2026, on a method the Department declines to publish, with no published route to an out-of-cycle increase. Getting that number wrong does not cost you a resubmission. It costs you the margin for the life of the product.
  • And one that costs everything, cheaply avoided. Nigeria publishes thirty-six actives that may be registered only as locally manufactured, and twenty-nine more under a migration policy. NAFDAC states it will not entertain a new application or a renewal for an imported product on either. Ten minutes with two published lists, before anything is commissioned, is the cheapest check on this site.

This is the actual argument for the assessment.

Not that £1,450 is cheap. That the three failures above are all decided in the first two weeks of a project — by the classification, the sequencing and whose name goes on the file — and all three are cheaper to get right than to unwind.

The comparison

Against doing it yourself

Prevailing rates for regulatory consulting run roughly $135–175 an hour for an associate, $250–300 for mid-level and $340–400 for senior work. Those are market figures rather than ours, and we quote them because they make the fixed fee legible: at the middle of that band, £14,000 is somewhere around fifty hours of senior time.

A first-market registration is more than fifty hours. Classification and its defence, structure design, finding and vetting a representative, contracting them properly, assembling a dossier to a format you have not used before, and answering deficiency questions in a second language — that is a project, not a task. A fixed fee is our bet that we have scoped it correctly, and if we are wrong the loss is ours.

Doing it in-house is not primarily a question of hours, though. It is that your regulatory manager will be learning that market on your fee schedule, and the regulator does not refund the fee when the learning shows up in the file.

The honest exception. If you already have a regulatory team that has registered in this market before, you probably do not need us for the registration at all — you may only need the representative found and contracted properly. Say so on the first call and we will quote that alone. It is a much smaller number, and we would rather have the smaller engagement than sell you the larger one.

Questions

Asked before most quotes

Why is the project range so wide?

Because the difference between a clean file and an incomplete one is genuinely six figures of effort over a portfolio — whether that file is a CE technical file or a common technical document. The assessment closes the range to a fixed number before you commit to anything.

Can we pay you to just review a quote we already have?

Yes. That is a route assessment with a narrower brief, at the same fee. We will tell you plainly if the quote you hold is reasonable — sometimes it is, and we say so.

What happens if the regulator raises its fees mid-project?

The official fee changes and we invoice the new amount at cost. Our fee does not move — that is what fixed means.

Is a medicine more expensive than a device?

Our fee, modestly — the dossier work is heavier. The regulator's fee, sometimes by an order of magnitude, and almost always because of the foreign GMP inspection rather than the registration itself. The assessment separates the two before you commit.

Do you discount for several markets at once?

Yes, on the assessment: £600 per additional market rather than £1,450. On registration projects the saving is real but smaller, because each market is a separate submission to a separate authority.

Start with the number that matters

Not our fee — the total. Two weeks and £1,450 gets you every line above filled in for your product, its class or pathway, and your markets.

Check your route

Or reach us directly — mail@bcabusiness.co.uk · +44 7342 901002 · WhatsApp

```